Free checks Client loginBook a call
A tradesman in a hi-vis jacket holds a phone on a building site at dusk, cranes behind.

First reads.No call required.

Three checks, worked out on the spot. How long have I got? Am I still in time? Where's control weak? A first read, not a determination.

Pick a check.

Three problems, three checks. Each one shows you a result you can read, with the dates or the score drawn out.

Checks3
CostNil
Sheet no.FC1
A thick contract with coloured tabs and a pen beside a letter on a dark table.

How long have I got?

Enter the day your payment claim was served. See the schedule date, the due date and the adjudication dates under the NSW Act.

What you get backEvery date, written outwith its section of the Act, on a drawn timeline.

ServedScheduleDueYour last dayCheck my deadline, free (NSW)
A flooded building site under grey rain cloud, a rain gauge in front and cranes behind.

Have I missed my EOT notice?

Enter the delay dates and your contract's notice period. See the last day for notice.

What you get backThe last day for noticecounted in your clause's days, with your notice placed on the line.

DelayYou knewNotice inLast dayCheck my EOT notice dates, free
A business owner stands at a window looking out over a building site at dusk.

Where's control weak?

One question for each part of the business. 1 means it is not in place. 5 means it is in place without you driving it every day.

What you get backA score out of 100and your six areas drawn as a 3D chart, lowest first to fix.

LowestGet my score

Watch it first.

Want to see one in use first? One minute: pick a check, enter your dates, read the result, and book if you need us.

FilmF15
Length1:00
Sheet no.F15

Got a claim or a contract in your hand?

Send it. We tell you which job fits, or that it's not our work, before you pay.

Send us the claim
A pencil resting on a construction drawing under a desk lamp.
Pick a check